Recreation Center                                  2010-2014                           Capital Improvements Program       Schedule for Five Year Period
            Special assessment Bonds = a                                Abatement District = ad                                                County = c Electric Utility =  eu Federal Funds =  f Flood Control Reserves =  fr    
                     Food & Beverage Tax = fb                  General Obligation Bonds = go            Golf Surplus Park & Rec Fund = gs Lodging Tax =  lt MN State Aid - Streets =  ms Operating Trfs - fr Storm Water =  os    
    Operating Trfs - fr General Fund = ot           Operating Trfs - fr Sewer Utility = ow                                     Private Funds = p Passenger Facility Chgs =  pc Project Reserves =  r GO Revenue Bonds =  rb    
                          Retained Earnings = re                                         State Funds = s                    Sn/Sewer Availability Chg = sa State Loan Fund =  sl Sales Tax =  st Storm Water Mgmt Chg =  sw    
                                          Tax Levy = t               Traffic Improvement Dist Chg = td                                    Tax Increments = ti Operating Trfs - fr Other Funds = to Water Availability Chg =  wa Water Utility =  wu    
 2002-2009  
Sort Map # Project Description Proj # Total Budget CIP Bdgt Amts 2010 2011 2012 2013 2014 2002 2003 2004 2005 2006 2007 2008 2009 Totals
0       0
1 1 South rink upgrade including replacement of dasher boards / glass. 2919                100,000               100,000  t  0
1     0
2 2 Rec Center improvements.  Construction of a storage building for storage of ice resurfacer and snow removal equipment. 2919                550,000             500,000  t                50,000  t          t 50000 50000 25000 75000 50000 50000 100000 100000 500000
2     0
3 3 Replacement of the entire pool filtration system and chemical feeding process.                500,000               250,000  t              250,000  t  0
3     0
4 4 Replacement of the pool shell, including resurfacing of the pool bottom and sides with diamond brite.                150,000                                               75,000  t                75,000  t  0
4     0
5 5 Pool deck and shower upgrades including resurfacing the entire pool deck, hallways, locker room floors, and upgrading the showers.                100,000                   50,000  t                50,000  t  0
5       0
6 6 Bleacher replacement of the east side pool deck bleacher sections.                  50,000                                               50,000  t  0
6       0
7 7 Door replacment - replace approximately 20 exterior doors in the facility.                  20,000                   20,000  t  0
7       0
     
                       
Total Cost              1,470,000             500,000               100,000                 50,000               250,000               375,000               195,000  
Sources of Funds
Tax Levy t            1,470,000             500,000 t             100,000 t               50,000 t             250,000 t             375,000 t             195,000 t
Total Sources of Funds              1,470,000             500,000               100,000                 50,000               250,000               375,000               195,000   500000
                   -  
                 -